top of page

Architecture / Town Planning / Interior Design / Project Management

About

New build Passivhaus located in Hindhead. The proposal seeks to take advantage of the steep slope across the site with limited mass at the ground floor and an extensive lower ground floor which is partially dug into the slope. The scheme is a certified Passivehaus development.

Size

200m²

Location

Hindhead, Waverley

Year

TBC

Duraton

TBC

RIBA Stage

RIBA Stage 3

Hindhead, Waverley

Hindhead, Waverley

Size

200m²

Location

Hindhead, Waverley

Year

TBC

RIBA Stage

RIBA Stage 3

Duraton

TBC

bottom of page